Sign In | Join Free | My enlightcorp.com
enlightcorp.com
Products
Search by Category
Home > Bathroom Faucets >

products The polymer cement waterproof coating

Country/Region china
Company cxsse company
Categories Cement Waterproofer
Telephone 98745632102
ICP License Issued by the Chinese Ministry
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
  • Submit Buying Request
    • Product Details
    • Company Profile

    products The polymer cement waterproof coating

    Detailed information

    Product Overview

    Water-resistant polymer cement waterproof performance synthetic pulp is imported acrylic emulsion polymer and inorganic powder formulated in accordance with the proportion of science and have some kind of two-component flexible waterproofing slurry. Has excellent impermeability, waterproof, adhesive properties.

    Standard

    Technical indicators in line with JC / T 2090-2011 "polymer cement waterproof slurry" requirement.

    Product Features

    Aqueous slurry, non-toxic, harmless, energy saving, environmental protection, pollution;

    Strength, strong adhesion, water impermeability, good weather resistance;

    In the wet surface of the base construction, short curing time, which can effectively shorten the construction period;

    Particularly suitable for the waterproof layer of decorative materials (such as putty, plaster, tile, etc.) construction directly.

    Products barrel after opening the two-component Stir in proportion to use, easy to operate, quick construction.

    The perfect combination of two-component, acid, alkali, salt, mold, stability can maintain a permanent waterproof;

    Dosage: every millimeter thick film coating using about: 2.0Kg / m.

    Applications

    Suitable for toilet and bathroom, kitchen, ground floor, balconies, terraces and other works of waterproof, impervious and moisture.

    Handle all types of buildings seepage, leakage repair, all kinds of pond water, seepage, etc.

    All kinds of rigid surface seepage, waterproofing, sealing, moisture and so on.

    Construction Points

    Primary treatment: Requires a solid, flat, smooth, not from the sand, and have shed from the skin, loose animals and other phenomena; cellular base surface, holes, cracks and down pipes and other first with the plugging material around the block smooth, sharp edges and protrusions should be removed, yin and yang angle arc made of nodes; before brushing, spraying water mist application base sufficiently moist (but not in water).

    Paint preparation: First, slowly pour the powder supporting the emulsion side down while stirring with an electric mixer, stir for about 5 minutes until a homogeneous slurry, the slurry was allowed to stand 10 minutes stirring after 2 minutes to fully matured. Note: when secondary mixing stirrer at the bottom of the container, do not do to enhance the sport, so as not to paste wrapped into the air after a good tune slurry used within one hour.

    Additional detailed structure waterproof coating layer: The yin and yang angle, tube roots detailed structure should be additional waterproof layer construction; For additional coating matrix material should be caught in the middle, paving flat, no hollowing, Alice, etc. , and is guaranteed to be completely soaked paint;

    Waterproof coating layer construction: Scratch or brush can be used, should be completed in 2 to 3 times; at points over the coating, brushing should be on the next pass over the cured coating dry before proceeding to the table after brushing twice direction should be perpendicular to each other; when facade construction, should be thin coating many times.

    Construction Notes

    Should ensure a well-ventilated spot, suitable for the construction of the ambient temperature 5 ~ 35 ℃, avoid exposure during the summer construction.

    Do other types of jobs in the construction area of the cross, after the completion of the coating should be protected.

    Paint should be used with the mix with, and should be used within a specified time, usually after mixing paint not more than one hour, in order to avoid waste.

    Sprinkler maintenance should be performed two to three days after construction ends 24 hours.

    Water testing and paste tiles should, after 72 hours drying and curing the coating. Lower temperatures should be extended. For pasting tiles on waterproof coating, we recommend using a dedicated low-grade cement tile adhesive or mortar paste.

    Storage and transport

    This product is flame retardant materials, according to general cargo transport. Transport should avoid the rain, sunlight, cold, prohibit the collision, extrusion, and keep the packaging intact.

    The product should be in a dry, ventilated, cool place storage, storage temperature should not fall below 5 ℃.

    Under normal transportation, storage conditions, from the date of production of the storage period of not less than 12 months.

    Published date:2014-8-19 Browse:13
    Buy products The polymer cement waterproof coating at wholesale prices
    Send your message to this supplier
     
    From:
    To: cxsse company
    Subject:
    Message:
    Characters Remaining: (0/3000)
     
    Inquiry Cart 0