Sign In | Join Free | My enlightcorp.com |
|
All dcim modular data center construction wholesalers & dcim modular data center construction manufacturers come from members. We doesn't provide dcim modular data center construction products or service, please contact them directly and verify their companies info carefully.
Total 170 products from dcim modular data center construction Manufactures & Suppliers |
|
![]() |
Brand Name:LionRock Model Number:All-in-one combined 40ft Place of Origin:Dongguan China Container Dimensions Data Center , DCIM Modular Data Center Construction Power Module1 The power module is a single ISO40HC container with four levels of power capacity that can be upgraded from the basic configuration to 480kW ... |
3tech corporate limited
|
![]() |
Brand Name:COOLNET Model Number:Modular Data Center Place of Origin:CHINA ... centers. The overall equipment room adopts modular construction, which is divided into power cabinets, battery cabinets, air-conditioning cabinets, IT cabinets, etc., and adopts the layout of hot and cold aisles to fully ... |
Hefei Coolnet power Co., ltd
Anhui |
![]() |
Brand Name:ZOYET Place of Origin:China ... for data center construction or as a stand-alone module for creating a separate disaster recovery site for business owners. Additionally, it is also a viable solution for military projects, oil and ... |
Wuxi Huanawell Metal Manufacturing Co.,Ltd.
Jiangsu |
![]() |
Brand Name:Liruisi Model Number:LRS-10-RS Place of Origin:China ...Modular Data Center Solution for Scalable Requirements Product Description: Modular Data Center: Highly Efficient, Scalable, and Remotely Managed Data Storage Solution The Modular Data Center is an advanced onsite data storage center that provides highly efficient, compact data hosting and modular data processing capabilities. With a power capacity of up to 150Kva, this data center... |
Shenzhen Liruisi Electronics Co., Ltd.
Guangdong |
![]() |
Brand Name:TC Model Number:GM-* Place of Origin:China Micro Modular Data Center Application Modular Data Center is designed for equipment rooms, and medium- and large data centers. Standardized components, de-engineered, ensured data center production in factories and realized the overall delivery to ... |
TC Smart Systems Group
Guangxi |
![]() |
Brand Name:Consnant Model Number:CON-03N Place of Origin:Shenzhen China ...easy flexible, expandable, intelligent micro data center product is one of the keys to the edge computing success. With all these in mind , we create this Consnant Micro Modular Data Center products platform. It‘s a plug and play, totally enclosed and |
Shenzhen Consnant Technology Co., Ltd.
Guangdong |
![]() |
Brand Name:kimoems Model Number:KM5000 Place of Origin:China ... power distribution, and emergency ventilation,the KM5000 enables standardization of complete micro datacenter configurationsacross multiple locations. --Application Small data centers and campus data centers, Banking, Financial and Insurance, Education. |
Hefei Kimo Electrical Co.,Ltd
Anhui |
![]() |
Brand Name:Cisco Model Number:N9K-C9504-B3-E Cisco Nexus 9504 Switch : High-Performance 21.6Tbps , Cloud-Ready & Modular Data Center Switch The Cisco Nexus 9504 Switch (N9K-C9504-B3-E) is a modular, cloud-optimized data center switch designed for high scalability, low latency, and seamless multi-... |
Beijing Youwang Times Technology Co., Ltd.
Shanghai |
![]() |
Brand Name:1MW Model Number:1MW-BOX Place of Origin:China 1MW-BOX Modular Data Center Professional Miner Contanier 40ft |
Chengdu Chenxiyu Technology Co., Ltd.,
Sichuan |
![]() |
Brand Name:SOROTEC Model Number:MPS9335C 10 - 300KVA Place of Origin:China ...Modular UPS 3Phase MPS9335C 10-300KVA for Data Center / Telecom / Servers MPS9335C Series Modular UPS 10-300KVA Support 4 units UPS for parallel working/Output power factor is 0.9/3Ph in and 3Ph out/Online capacity expansion and maintenance/Extra LCD display 13 type languages/Extra wide input voltage and frequency ranges/widely used to provide reliable and long time backup power supply for IDC(Internet Data Center), computing center... |
Shenzhen SORO Electronics Co., Ltd.
Guangdong |
![]() |
Brand Name:CT Steel Structure Model Number:Multistorey86101 Place of Origin:China ... a cutting-edge solution designed for the development of industrial complexes that integrate office spaces, manufacturing areas, and storage facilities into a unified, modular structure. This system leverages advanced steel construction techniques to |
China CT Steelstructure Co.,Ltd
Shandong |
![]() |
Brand Name:OEM Place of Origin:CHINA Model Number:12F cassette OM3 standard loss ... splicing and patching cable management, as well as managing and housing easy plug MTP/MPO to LC fiber cassette modules. With delivering modular Drawer Type and traditional fixed type panel, ORC can |
Optic River Communication Ltd
Guangdong |
![]() |
Brand Name:CPSY Model Number:CPY1060 Place of Origin:China (Guangdong) Modular ups 10kva N+A or N+X parallel redundancy online ups power supply for data center CPY series Modular UPS 10-300KVA Model:CPY1020/CPY1040/CPY1060/CPY1590/CPY2080/CPY20120/CPY20180/CPY20200/CPY3090/CPY30120/CPY30210/CPY30300 UPS power range: 10KVA~... |
Shangyu (Shenzhen) Technology Co. Ltd
Guangdong |
![]() |
Brand Name:langji or OEM Model Number:Lk-0415 Place of Origin:CN Data Center Rack Access Control,22u Rack Server Cabinet With Vented Door Modular Data CenterRack Cabinet Data Center PDU Oem 42u Spcc Cold Rolled Steel 36kv Modular Ac Power Distribution Cabinet Name Quantity ( PCS ) Input Voltage 220/380v, TN-S system1 ... |
Beijing Ding Ding Future Technology Co.Ltd
Beijing |
![]() |
Brand Name:MRJH Model Number:DC EFU 1170X1170X110+35 Place of Origin:Guangdong, China ...Modular Energy-Saving Air System for Data Centers | Ultra-Low Noise & Smart IoT Control The DC EFU 1170X1170X110+35 redefines precision air filtration for hyperscale data centers, server farms, and edge computing facilities, combining a patented modular ... |
Shenzhen Meiri Purification Technology Co., Ltd.
Guangdong |
![]() |
Brand Name:Daxin Place of Origin:SHENZHEN Model Number:RM33-60-600 KVA ... power supply. It is designed with STS modules, power modules, and battery modules for easy maintenance and replacement. The power module features modular and hot-swap design, providing a cost-effective power solution that |
Shenzhen Daxin Intelligent Equipment Technology Co., Ltd
|
![]() |
Brand Name:OEM and ODM Model Number:1U 19 inch 96 Cores MPO MTP Rack Mount Patch Panel Place of Origin:Made in China ... Patch Panel saves on-site installation time and increase reliability. Features of MPO MTP Rack Mount Patch Panel for Data Center Can hold 4 pieces of cassettes / modules in 1U Modular system |
Shenzhen Begate Technology Co.,Ltd.
|
![]() |
Brand Name:SANTAK Model Number:SANTAK Castle 3C3 HD 80KVA Place of Origin:Guangdong, China SANTAK Castle 3C3 HD Three Phase 80KVA 80KW Online Tower Internal Modular UPS for Data Center Networking Telecommunications Specification Capacity 80kVA Place of Origin Guangdong, China Brand Name SANTAK Model Number SANTAK Castle ... |
Visench Technology Co., Ltd.
|
![]() |
Brand Name:Inspur Model Number:Inspur NF5260M6 Place of Origin:China ...data centers New xeon server NF5260M6/FM6 NF5260M6/FM6 is Inspur's first dual-socket server that supports on-demand front and rear I/O. With a flexible and modular design that can respond to various Internet applications, it is an ideal choice for data centers... |
Beijing Qianxing Jietong Technology Co., Ltd.
Beijing |